| NAME OF THE DOCUMENT | WORD 6
per Mac |
| Instructions for downloading | |
| IFMIF Conceptual Design Activity, Cost Report,
IFMIF CDA Team,ORNL Report, ORNL/M-5502 compiled by M.J.Rennich, (December 1996) |
399k |
| Appendix D-Cost Estimating Worksheets | |
| D1. Work Breakdown Structure 1.0 Worksheets | |
| D2. Work Breakdown Structure 2.0 Worksheets | |
| D3. Work Breakdown Structure 3.0 Worksheets | |
| D4. Work Breakdown Structure 4.0 Worksheets | |
| D5. Work Breakdown Structure 5.0 Worksheets | 213k |
| D6. Work Breakdown Structure 6.0 Worksheets |